Skip to main content

Wanlin Group · AndroidSBC · RK3399-TP170 Transport Payment Board Evaluation

RK3399-TP170 Transport Payment Board Evaluation

Evaluate the RK3399-TP170 reference using ticketing workflow, displays, scanners, printers, power recovery and the exact software and hardware revision.

Location:Home>Product Center
RK3399-TP170 Transport Payment Board Evaluation
RK3399-TP170 Transport Payment Board Evaluation

Configuration and document request

Published:
Content updated:

Use the exact configuration and controlled documents for a product decision.

Availability: Request confirmation for the selected configuration.

Details

Project scope

RK3399-TP170 is the catalogue reference used on this page for transport, parking and ticketing equipment. Select against a documented board, PCB revision, software build and complete equipment workload. Historical catalogue options are not a promise that every delivered configuration has the same capabilities.

Ticket and gate workflow

Define how identifiers, fare calculation, payment status, receipt and the gate command relate. Specify the response to a network, printer or power interruption.

Interface responsibility

Provide display timing, touch and scanner documents, printer power demand, serial electrical levels and any isolation requirements. Do not assume a board GPIO is a safety-rated gate controller.

Operating environment

Define the enclosure, supply, temperature conditions and peripheral concurrency. Request the applicable model limits and test evidence; the historic Wide-Temp label is not a verified rating for every build.

Sample acceptance

  1. Record the model, PCB revision, software build and connected equipment.
  2. Agree measurable workload and interface criteria before testing.
  3. Test the intended combination, including restart, disconnect and recovery.
  4. Keep conditions, results, failures and accepted limitations together.
  5. Approve a defined configuration before production.

Documents and commercial scope

Request the controlled specification, mechanical drawing, pinout, BSP release notes, recovery method, acceptance records and applicable compliance evidence. Confirm price, availability, quantity, schedule, support and change control in a written quotation. This page does not establish certification or a fixed performance result.

Published document status · Procurement and BSP questions · Send a project enquiry

Evidence and publishing boundary

Published by Wanlin Group under the AndroidSBC identity. Confirm capabilities for the exact model, PCB revision and software build using controlled documents and agreed tests. Editorial maintenance is not an engineering certification.

Document status · Editorial policy · Request project evidence

tags: ticket terminal PCBA ODM